Menen crossing

  • Location: MENEN [BE]
  • Discipline: PORT, RIVER & HYDRAULIC ENGINEERING
  • Period: 2018 - ...
  • Publication of specifications for bicycle and pedestrian bridge
    Mid-2021
  • End of demolition phase 1
    September 2021
  • Publication of specifications for demolition phase 1
    January 2020
  • Start of study phase
    September 2018
  • Seine Schelde Leie Doortocht Menen-1
    Copyright: Omgeving
  • Seine Schelde Leie Doortocht Menen SBE engineering grote schepen binnenvaart waterbouw
    Copyright: Omgeving
  • Seine Schelde Leie Doortocht Menen SBE engineering grote schepen binnenvaart waterbouw
    Copyright: Omgeving
  • Seine Schelde Leie Doortocht Menen SBE engineering grote schepen binnenvaart waterbouw
    Copyright: Omgeving

The crossing of the Lys in Menen is part of the broader Seine-Scheldt project. This includes the implementation of an inland navigation link for larger vessels (CEMT class Vb) between the Seine basin and the Scheldt basin and the North Sea ports. In order to allow these larger ships to sail on the Lys, the narrow waterway with its sharp bends had to be tackled at Menen. In this project, SBE is acting as the co-ordinator for the Menen Crossing Partnership, in which SBE is collaborating with Ney+Partners (bridge design) and OMGEVING (public space design).

The works on the Lys crossing in Menen are on two fronts: on the one hand the straightening of the Lys itself in the city centre, which includes new quay walls and a new bridge, and on the other a new bicycle and pedestrian bridge in the outskirts of the project area.

After a thorough inventory phase, a nautical design was made for the Lys axis within the entire project area. This develops both the straightening in the city centre and the future widening of the bend in the periphery. The nautical design in the periphery is important in determining the siting of the bicycle and pedestrian bridge: after all, we must be sure that there will be no conflict with the future widening of the Lys. The widening of the bend that will be needed here will only be done later, during the calibration works on the river (future project for reach 160) while the bridge is already being built. This bridge will be part of the Komen-Deinze bicycle highway and will also connect the city centre to the future Barakkenpark.

Subsequently, a preliminary design was developed for the entire project area. This preliminary design includes the new quay walls, the new central bridge in Rijselstraat, the entire public space in the core zone, the future banks in the peripheral zone and the bicycle and pedestrian bridge. In drawing up this design, both the new waterway situation and the surrounding quays, bridges and utilities – as well as the impact on the latter – were taken into account.

In order to make the straightening of the Lys and all the associated works in the central zone possible, a considerable number of buildings will have to be demolished. Before the start of the design work, De Vlaamse Waterweg itself had already taken the initiative for the necessary acquisitions and expropriations. The co-ordination of the transfer of ownership and the development of the final demolition works are part of this project.

Responsibilities SBE (within joint venture Doortocht Menen)

  • The inventory of all existing infrastructure and the creation of the GIS portal
  • The nautical design of the fairway within the entire project area (central zone & peripheral zone)
  • The preliminary design of the banks within the entire project area (quays in the central zone & banks in the peripheral zone)
  • The tender design for the new quay walls in the central zone
  • Co-ordination with the utility companies
  • Monitoring of acquisitions and demolitions
  • Preparation of all necessary permits
  • Preparation of all tender files
  • Monitoring the works as a technical advisor to the client
  • General project management

Masterplan

  • Seine-Schelde sluis Harelbeke engineering SBE #teamsbe #expertsatplay

    Refurbishment Seine Scheldt

    The Seine Scheldt project is a European initiative linking the Seine Basin (Paris region) with the Scheldt Basin (Antwerp). In Flanders, De Vlaamse Waterweg nv, supported by the European Union, is leading this pilot project. For our country, this means specifically adapting 7 waterways. On the one hand, sailing capacity will be increased, but on the other there is a need to carry out river restoration, recreation on and along the water, and urban renewal.
    View this project

Other subprojects

  • Seine-Schelde sluis Harelbeke engineering SBE #teamsbe #expertsatplay

    Redevelopment of the Leie and lock complex at Harelbeke

    In order to make the Seine-Scheldt section navigable for ships up to 4,500 tonnes, the river Lys in Harelbeke needed to be made deeper. The future-proofing of the water site was accompanied by a new lock and barrage complex, the construction of 3 new bridges (2 fixed and 1 movable), bank defences, quay walls, soil protection and the redevelopment of the immediate surroundings.
    View this project
  • Seine-Schelde_Leie Pand 140 Sint-Baafs-Vijve Deinze De Vlaamse Waterweg Seinebekken SBE engineering #teamsbe #expertsatplay

    Calibration Lys Reach 140 (Sint-Baafs-Vijve to Deinze)

    This subproject involves the passage of the Lys between Sint-Baafs-Vijve and Deinze. In addition to the adjustment of the calibrated profile (especially from a nautical and hydraulic perspective), this project also focuses on the ecological and landscape aspects.
    View this project
  • Seine Schelde Pand 150 Harelbeke Sint-Baafs-Vijve SBE engineering #teamsbe #expertsatplay

    Calibration Lys Reach 150 (Harelbeke to Sint-Baafs-Vijve)

    This subproject involves the passage of the Leie River between Harelbeke and Sint-Baafs-Vijve. The Leie is deepened and widened (calibrated) to allow larger vessels to navigate on the waterway. In addition to the adjustments from a nautical and hydraulic perspective, this project also focuses on the ecological and landscape aspects by establishing nature-friendly riverbanks.
    View this project

Recent projects

From Antwerp to India, SBE is taking steps in progress and innovation all over the world. Below you will find a selection of our most recent projects.

Discover all projects

Our awards

Other news

Curious about what is happening within SBE? Or in which projects we are involved? Through these newsitems we will keep you informed about our projects and the ins and outs within SBE.

Discover our scoops
Seine-Schelde sluis Harelbeke engineering SBE #teamsbe #expertsatplay

Questions?

Do not hesitate to contact us, we are happy to help you!

Contact us