We are back with the fifth edition of the Student Challenge design competition for students. Are you ready? Discover the challenge and how you can win the competition here.

Railway underpass Farciennes

  • Location: FARCIENNES [BE]
  • Discipline: URBANISM & DESIGN
  • Period: 2019 - ...
  • Opening
    May 2024
  • GOLD - Urban Development, Infrastructure & Mobility - Belgian Construction Awards
    2023
  • Inserting tunnel
    25 - 26 March 2022
  • Start phase 3
    November 2021
  • Phase 1 and 2 have been completed
    May 2021
  • Approval of environmental permit & start execution works
    January 2021
  • Environmental permit application
    December 2019
  • Approval of preliminary design
    November 2019

The Municipality of Farciennes asked SBE to transform the grubby and unsafe underpass below the railway line into an attractive public space that not only connects the various parts of the municipality but also turns an otherwise socially uninteresting part of the public road into a place for people to come together.

  • Farciennes
  • Farciennes
  • Farciennes
  • Farciennes

The railway line running through Farciennes made for a hard, impassable gap in the village scene. In order to knock down this barrier, a design was introduced to serve as a link between the two separated areas and to link the surrounding streets together. In order for this project to succeed, it’s important that vulnerable road users feel at home here and can move naturally among the various elements and transitions. Indeed, it’s these people who will be central to the approach to this project.

As a genuine multi-tasker, the space regained will adopt several functions at the same time: platform, passage, terrace, common area, street, or footpath. This makes it necessary to develop a uniform whole that not only links the separate ‘sub-spaces’ together but also looks like a single entity. The latter will be achieved by making the right choices for the use of materials and a suitable design.

In collaboration with the municipality of Farciennes, SBE’s plan for the underpass below the track will restore the essence of the urban fabric, both visually and practically. With a design inspired by the municipality’s industrial past – the references to mining industry artefacts being the most notable details – the new Farciennes will remain true to itself.

  • Farciennes
  • Farciennes

Responsibilities SBE

  • Design sketch
  • Preliminary design
  • Definitive design
  • Outsourcing and implementation file
  • Permit request
  • Monitoring of the works

Recent projects

From Antwerp to India, SBE is taking steps in progress and innovation all over the world. Below you will find a selection of our most recent projects.

Discover all projects

Our awards

Other news

Curious about what is happening within SBE? Or in which projects we are involved? Through these newsitems we will keep you informed about our projects and the ins and outs within SBE.

Discover our scoops
Seine-Schelde sluis Harelbeke engineering SBE #teamsbe #expertsatplay

Questions?

Do not hesitate to contact us, we are happy to help you!

Contact us