Rotterdam Central Station

  • Location: ROTTERDAM [NL]
  • Discipline: INDUSTRY & BUILDINGS
  • Period: 2008 - 2009
  • End of the studie
    2009
  • Start of the studie
    2008
  • Rotterdam Centraal
    Rotterdam Centraal Station and its environment
  • Rotterdam
    Rotterdam Centraal Station and its environment
  • Rotterdam Centraal
    Rotterdam Centraal Station and its environment
  • Rotterdam Centraal engineering SBE #teamsbe #expertsatplay
    Rotterdam Centraal Station and its environment
  • Rotterdam Centraal engineering SBE #teamsbe #expertsatplay
    Rotterdam Centraal Station and its environment
  • Rotterdam Centraal engineering SBE #teamsbe #expertsatplay
    Rotterdam Centraal Station and its environment

Rotterdam Central Station is a public transport terminal of international standing. The connection to the European network of high-speed trains and light rail connections is expected to lead to a substantial increase in passenger numbers by 2025, of up to 320,000 passengers per day.

The station hall is made from shiny stainless steel and forms a sculptural icon on Rotterdam’s cultural axis. The roof of the hall is folded, just like origami, and is made from steel. The roof and awnings are finished in stainless steel on the outside, with wooden ceiling cladding on the inside. SBE assisted the contractor, Iemants, with this section, working on a layout of a 3D model.

Rotterdam Centraal engineering SBE #teamsbe #expertsatplay

In addition, the contractor CSM Steel Structures were able to rely on SBE’s extensive expertise when it came to the roof tracks. The main supporting structure consists of a system of steel longitudinal trusses, with Y-shaped columns, hearkening back to the shape of the old platform roof. The roof is clad in photovoltaic glass and is ‘folded’ over, ending in a fully glazed north façade. For this section, SBE completed the main study, detailed study and the drawing work.

Responsibilities SBE

  • SBE's assignment includes the execution of the main study, detailed study and the drawing work for the steel construction.
  • Main and detailed study: Carrying out the main and detailed study according to the current NEN standards, including construction and temporary phases
  • Design: Making the following drawings and lists: overview drawings of the steel structure, workshop drawings, assembly plans, bolt lists and parts lists.

Recent projects

From Antwerp to India, SBE is taking steps in progress and innovation all over the world. Below you will find a selection of our most recent projects.

Discover all projects

Our awards

Other news

Curious about what is happening within SBE? Or in which projects we are involved? Through these newsitems we will keep you informed about our projects and the ins and outs within SBE.

Discover our scoops
Seine-Schelde sluis Harelbeke engineering SBE #teamsbe #expertsatplay

Questions?

Do not hesitate to contact us, we are happy to help you!

Contact us