Redevelopment of the Leie and lock complex at Harelbeke

  • Location: HARELBEKE [BE]
  • Discipline: CIVIL ENGINEERING & INFRASTRUCTURE, PORT, RIVER & HYDRAULIC ENGINEERING
  • Period: 2011 - 2020
  • Leieleute, the official opening of the project
    January 2020
  • Fish ladder finished
    November 2019
  • Official opening of new weir lock, start demolition of temporary lock
    March 2018
  • Commissioning of temporary lock
    July 2016
  • Installation of high bridge
    January 2016
  • Commissioning of temporary weir
    August 2015
  • Start of preparatory works on site
    January 2015
  • Submission of building application file
    December 2013
  • Award to THV Leieland
    April 2013
  • Start of study of the D&B tender phase
    January 2011
Seine-Schelde sluis Harelbeke engineering SBE #teamsbe #expertsatplay

In order to make the Seine-Scheldt section navigable for ships up to 4,500 tonnes, the river Lys in Harelbeke needed to be made deeper. The future-proofing of the water site was accompanied by a new lock and barrage complex, the construction of 3 new bridges (2 fixed and 1 movable), bank defences, quay walls, soil protection and the redevelopment of the immediate surroundings.

Rebuilding the lock and weir

One of the most radical and spectacular parts of the work in Harelbeke is the replacement of the lock and weir. The lock was scaled up to a length of 230 m, a width of 12.5 m and a depth of 4.7 m. The weir with its 2 turbines is installed next to the lock and supplies it with electricity all year round. This allows the intermediate doors to be operated; these make it possible to open only one part of the chamber for smaller vessels to pass through, thus allowing them to be moved more quickly.

In order to keep the river Lys navigable during the works and to avoid flooding, a temporary lock and weir were built.

  • Seine-Schelde sluis Harelbeke engineering SBE #teamsbe #expertsatplay
  • Seine-Schelde sluis Harelbeke engineering SBE #teamsbe #expertsatplay
  • Seine-Schelde sluis Harelbeke engineering SBE #teamsbe #expertsatplay
    DCIM102MEDIADJI_0422.JPG

View the lock complex from the air here.

Work on the bridges

An extension of the waterway for larger vessels also requires an adaptation of the bridges running over it to have a clear height of at least 7 meters (over a width of 35 meters). The Hogebrug was therefore adapted to these standards. In addition, it was extended with a safe lane for vulnerable road users. As well as the Hogebrug, the Banmolensbrug—a fixed road bridge in the direction of the mills—was also tackled. A third new bridge, the Bloemmolensburg, was built as a movable bicycle bridge.

Construction of the Moleneiland with fish run

At this stage, the focus was mainly on the underwater inhabitants of the Lys. Under the ‘River restoration’ project section, the ecological potential of the river, which has been canalised for many years, was adapted and maximised. Where possible, nature-friendly bank defences were provided, cut-off ‘dead’ meanders were reconnected, and favourable conditions for fish migration were restored.

Reconstruction of the immediate surroundings

No half measures for Seine Schelde Flanders. The work on the waterway provided a good time to renew and refurbish the adjacent roads and sewers. Paying attention to vulnerable road users and the inclusion of green zones were key to this.

  • Seine-Schelde sluis Harelbeke engineering SBE #teamsbe #expertsatplay
  • Seine-Schelde sluis Harelbeke engineering SBE #teamsbe #expertsatplay
  • Seine-Schelde sluis Harelbeke engineering SBE #teamsbe #expertsatplay
  • Seine-Schelde sluis Harelbeke engineering SBE #teamsbe #expertsatplay
  • Seine-Schelde sluis Harelbeke engineering SBE #teamsbe #expertsatplay

Get to know our Experts at Play behind the project

Guy worked as a project engineer on this challenging project. Discover his story and, who knows, you may soon become his colleague. Go to our job page to view the vacancies available.

Responsibilities SBE

  • Drawing up calculation notes for temporary and permanent constructions
  • The nautical study
  • Drawing up the necessary plans
  • Participating in consultation meetings

Masterplan

  • Seine-Schelde sluis Harelbeke engineering SBE #teamsbe #expertsatplay

    Refurbishment Seine Scheldt

    The Seine Scheldt project is a European initiative linking the Seine Basin (Paris region) with the Scheldt Basin (Antwerp). In Flanders, De Vlaamse Waterweg nv, supported by the European Union, is leading this pilot project. For our country, this means specifically adapting 7 waterways. On the one hand, sailing capacity will be increased, but on the other there is a need to carry out river restoration, recreation on and along the water, and urban renewal.
    View this project

Other subprojects

  • Seine Schelde Leie Doortocht Menen SBE engineering grote schepen binnenvaart waterbouw

    Menen crossing

    The works on the Lys crossing in Menen are on two fronts: on the one hand the straightening of the Lys itself in the city centre, which includes new quay walls and a new bridge, and on the other a new bicycle and pedestrian bridge in the outskirts of the project area.
    View this project
  • Seine-Schelde_Leie Pand 140 Sint-Baafs-Vijve Deinze De Vlaamse Waterweg Seinebekken SBE engineering #teamsbe #expertsatplay

    Calibration Lys Reach 140 (Sint-Baafs-Vijve to Deinze)

    This subproject involves the passage of the Lys between Sint-Baafs-Vijve and Deinze. In addition to the adjustment of the calibrated profile (especially from a nautical and hydraulic perspective), this project also focuses on the ecological and landscape aspects.
    View this project
  • Seine Schelde Pand 150 Harelbeke Sint-Baafs-Vijve SBE engineering #teamsbe #expertsatplay

    Calibration Lys Reach 150 (Harelbeke to Sint-Baafs-Vijve)

    This subproject involves the passage of the Leie River between Harelbeke and Sint-Baafs-Vijve. The Leie is deepened and widened (calibrated) to allow larger vessels to navigate on the waterway. In addition to the adjustments from a nautical and hydraulic perspective, this project also focuses on the ecological and landscape aspects by establishing nature-friendly riverbanks.
    View this project

Recent projects

From Antwerp to India, SBE is taking steps in progress and innovation all over the world. Below you will find a selection of our most recent projects.

Discover all projects

Our awards

Other news

Curious about what is happening within SBE? Or in which projects we are involved? Through these newsitems we will keep you informed about our projects and the ins and outs within SBE.

Discover our scoops
Seine-Schelde sluis Harelbeke engineering SBE #teamsbe #expertsatplay

Questions?

Do not hesitate to contact us, we are happy to help you!

Contact us