Steel arched bridge in Grobbendonk

  • Location: GROBBENDONK [BE]
  • Discipline: CIVIL ENGINEERING & INFRASTRUCTURE
  • Period: 2010 - 2014
  • Anchoring of the new arched bridge and assembly at final location
    October 2014
  • End of Grobbendonk study
    January 2012
  • Start of Grobbendonk study
    January 2010
realisatie stalen boogbrug grobbendonk SBE engineering #teamsbe #expertsatplay

In 2007, the concrete bridge over the Albert Canal in Grobbendonk was severely damaged as a result of a collision. Consequently, the bridge was no longer able to carry the loads from the downstream side, which meant that road traffic had to pass in turn, travelling along one lane.

NV De Scheepvaart, in consultation with the municipality of Grobbendonk, decided to replace the existing concrete bridge with a steel bowstring bridge with a larger span of 108 metres. This also meets the needs of a European main waterway: the clearance height and width will be increased.

Once again, contractor Victor Buyck Steel Construction nv and SBE are working together to bring this project to a successful conclusion. In order to cause as little inconvenience as possible to shipping and road traffic, the bridge deck and arches were initially transported across the water to a nearby assembly site. By means of a shipping operation, the bridge was then placed in its entirety on the new abutments so that the concrete deck could be finished.

SBE was able to deploy its many years of expertise in supplying the complete implementation study for the steel superstructure and concrete substructure, including installation conditions, modifications to the banks and the design of the sheet piling at the construction sites.

  • realisatie stalen boogbrug grobbendonk SBE engineering #teamsbe #expertsatplay
  • Bergwijkbrug Ringvaart Merelbeke SBE engineering #teamsbe #expertsatplay
  • realisatie stalen boogbrug grobbendonk SBE engineering #teamsbe #expertsatplay

Responsibilities SBE

  • SBE was responsible for the implementation study of all steel structures included in the project

Masterplan

  • Noorderlaan SBE engineering #teamsbe #expertsatplay

    Road bridges Albert Canal

    The Albert Canal is the most important waterway in Flanders thanks to the rapidly growing container traffic over the past decade. Vlaamse Waterweg nv is therefore investing in the further expansion of this waterway to meet the requirements of a European principal waterway. The current clearance height and width under the bridges forms a funnel neck for inland navigation.
    View this project

Other subprojects

  • Viersel SBE engineering #teamsbe #expertsatplay

    Steel arched bridge Viersel

    Also in this project, the bridge in Viersel will be renewed in order to achieve a headway of 9.1 metres and the canal will be widened to 86 metres. SBE’s expertise was called upon by contractor Victor Buyck Steel Construction nv to bring this project to a successful conclusion. Various aspects needed to be addressed: demolishing the existing bridge, building the new abutment and a new steel bridge, adapting to the roadway so that it connects to the new bridge, and finally the construction of new bank defences.
    View this project

Recent projects

From Antwerp to India, SBE is taking steps in progress and innovation all over the world. Below you will find a selection of our most recent projects.

Discover all projects

Our awards

Other news

Curious about what is happening within SBE? Or in which projects we are involved? Through these newsitems we will keep you informed about our projects and the ins and outs within SBE.

Discover our scoops
Seine-Schelde sluis Harelbeke engineering SBE #teamsbe #expertsatplay

Questions?

Do not hesitate to contact us, we are happy to help you!

Contact us