We are back with the fifth edition of the Student Challenge design competition for students. Are you ready? Discover the challenge and how you can win the competition here.

All weather terminal

  • Location: GENT [BE]
  • Discipline: INDUSTRY & BUILDINGS, PORT, RIVER & HYDRAULIC
  • Period: 2016 - 2020
  • Works completed
    2020
  • Works started
    December 2018
  • Start of final design and implementation study
    June 2018
  • Award of contract to Stadsbader nv
    May 2018
  • Start of tender phase (tender design study)
    September 2016
  • all weather terminal Gent SBE engineering #teamsbe #expertsatplay
  • all weather terminal Gent SBE engineering #teamsbe #expertsatplay
  • all weather terminal Gent SBE engineering #teamsbe #expertsatplay

In the port of Ghent, a new All Weather Terminal is being built on ArcelorMittal’s premises in order to be able to load ships with high-grade steel products irrespective of weather conditions. The terminal consists of a storage depot into which two train tracks arrive. The incoming trains can be unloaded using three long overhead cranes. More than 2 million tonnes of steel can be shipped through the terminal each year.

Against this warehouse, a quay hall will be built on the existing canal bank (200m long and 57m wide). This hall is accessible to large ships onto which the steel products can be loaded by means of two Mantsinen cranes. Transport between the warehouse and the quay hall is in the form of six transfer trolleys and two half gantry cranes.

The quay hall will be founded on a new wharf on the canal side. On the other side, the quay wall will be extended so that the quay hall is sufficiently accessible to long ships. Finally, the access channel will also be provided with an underwater dam wall with guide poles.

Stadsbader nv called upon the expertise of SBE to design all of the hydraulic engineering works: the quay wall, wharf, embankment defences and shipping impact protection were all designed with the necessary care. The foundation of the buildings, the workshop floor and the concept study for the steel construction were also part of our range of tasks, as was supporting the client through from the quotation phase to the execution phase.

all weather terminal Gent SBE engineering #teamsbe #expertsatplay

Responsibilities SBE

  • SBE is responsible for the design of the foundations of the new terminal, as well as the design of the quay wall (including appurtenances) for the mooring of the ships.

Recent projects

From Antwerp to India, SBE is taking steps in progress and innovation all over the world. Below you will find a selection of our most recent projects.

Discover all projects

Our awards

Other news

Curious about what is happening within SBE? Or in which projects we are involved? Through these newsitems we will keep you informed about our projects and the ins and outs within SBE.

Discover our scoops
Seine-Schelde sluis Harelbeke engineering SBE #teamsbe #expertsatplay

Questions?

Do not hesitate to contact us, we are happy to help you!

Contact us