Road bridges Albert Canal

  • Location: ANTWERPEN [BE]
  • Discipline: CIVIL ENGINEERING & INFRASTRUCTURE
  • Period: 2008 - 2011
  • Start study
    2008
  • End of studie
    2014
  • Noorderlaan SBE engineering #teamsbe #expertsatplay
  • realisatie stalen boogbrug grobbendonk SBE engineering #teamsbe #expertsatplay
  • Viersel SBE engineering #teamsbe #expertsatplay

The Albert Canal is the most important waterway in Flanders thanks to the rapidly growing container traffic over the past decade. Vlaamse Waterweg nv is therefore investing in the further expansion of this waterway to meet the requirements of a European principal waterway. The current clearance height and width under the bridges forms a funnel neck for inland navigation.

The adjustments are therefore twofold:

  • The bridges will have a clearance height of up to 9.1 metres in order to allow container ships with 4 container layers to pass through smoothly and safely. In this way, transport by inland navigation is stimulated, which benefits mobility.
  • The narrowing of the canal will be removed to a passage width of 86 metres.

This major infrastructure project was divided up per bridge. SBE’s many years of expertise in the field of bridge construction, both in the design, execution and assembly phases, enabled various bridges to be designed smartly and safely positioned.

Responsibilities SBE

  • Preparation and delivery of the main calculations
  • Detailed calculations
  • Overview drawings and detailed drawings of the bridges and the steel piers

Subprojects

  • Noorderlaan SBE engineering #teamsbe #expertsatplay

    Road and tram bridge Noorderlaan Antwerp

    he first bridges to be tackled within this Master Plan are the Noorderlaan bridges in Antwerp. By working in phases, any inconvenience caused to road and waterway users was minimised. The new Noorderlaan bridge consists of 2 separate bridges: one for car traffic and one for public transport. Both bridges are mixed steel concrete bridges with steel substructures, which rest on 6 steel pillars.
    View this project
  • realisatie stalen boogbrug grobbendonk SBE engineering #teamsbe #expertsatplay

    Steel arched bridge in Grobbendonk

    In 2007, the concrete bridge over the Albert Canal in Grobbendonk was severely damaged as a result of a collision. Consequently, the bridge was no longer able to carry the loads from the downstream side, which meant that road traffic had to pass in turn, travelling along one lane.
    View this project
  • Viersel SBE engineering #teamsbe #expertsatplay

    Steel arched bridge Viersel

    Also in this project, the bridge in Viersel will be renewed in order to achieve a headway of 9.1 metres and the canal will be widened to 86 metres. SBE’s expertise was called upon by contractor Victor Buyck Steel Construction nv to bring this project to a successful conclusion. Various aspects needed to be addressed: demolishing the existing bridge, building the new abutment and a new steel bridge, adapting to the roadway so that it connects to the new bridge, and finally the construction of new bank defences.
    View this project

Recent projects

From Antwerp to India, SBE is taking steps in progress and innovation all over the world. Below you will find a selection of our most recent projects.

Discover all projects

Our awards

Other news

Curious about what is happening within SBE? Or in which projects we are involved? Through these newsitems we will keep you informed about our projects and the ins and outs within SBE.

Discover our scoops
Seine-Schelde sluis Harelbeke engineering SBE #teamsbe #expertsatplay

Questions?

Do not hesitate to contact us, we are happy to help you!

Contact us