Order your free copy of the ‘Inspiration Guide 2026’
and enjoy more than 200 pages of artwork and landscapes from SBE Urbanisme & Infra

Farakka lock

  • Location: FARAKKA [IN]
  • Discipline: ELECTROMECHANICS, PORT, RIVER & HYDRAULIC ENGINEERING
  • Period: 2017 - 2018
  • End of study
    December 2018
  • Start of study
    January 2017
  • Farakka India sluis lock
  • Farakka India Murshidabad Baghirati Jal Marg Vikas National Waterway sluis lock dam engineering hydromechanical components SBE #teamsbe #expertsatplay

A new lock is being built on the Farakka dam diverting canal in Murshidabad, India. The Farakka dam was built over the River Ganges with the intention to divert the water from the river to Bhagirathi. The significant difference between the water level upstream of the dam and the desired water level in the canal needed to be bridged with a lock to enable navigation.

The existing lock had become unusable over the years and therefore had to be replaced by a new lock, which was built parallel to the existing lock. The construction of the new lock is part of the ‘Jal Marg Vikas’ (National Waterway-1) project, financed by the World Bank. SBE was appointed as the international locks expert by Larsen & Toubro Engineering and Construction Company (LNTECC) under an EPC (Engineer, Procure and Construct) agreement with the Inland Waterways Authority of India (IWAI).

As part of this project, SBE acted to design the lock and provide the detailed design of the hydro-mechanical components, such as the point and sector doors, the lock and quay wall equipment (bollards, fenders, etc.), the electromechanical control systems and the hydro-electric drive systems of the lock. In addition, SBE’s practical expertise was also deployed in guiding the client in the tendering and execution phase.

Responsibilities SBE

  • Basic Design of the navigational lock
  • Detailed Design of Mitre Gates
  • Detailed Design of Caisson Gates
  • Detailed Design of Radial Gates
  • Detailed Design of Bulkhead Gates
  • Detailed Design of Lock appurtenances (bollards, fenders, ladders, capstans,…)
  • Detailed Design of Electro-mechanical and control systems
  • Detailed Design of Electro-hydraulic drive systems
  • Detailed design drawings and specifications
  • Bill of Quantities
  • Design Review of supplier's construction drawings and specifications
  • Quality Assurance Manuals for production and erection
  • Operations Manuals
  • Farakka India Murshidabad Baghirati Jal Marg Vikas National Waterway sluis lock dam engineering hydromechanical components SBE #teamsbe #expertsatplay
  • Farakka India Murshidabad Baghirati Jal Marg Vikas National Waterway sluis lock dam engineering hydromechanical components SBE #teamsbe #expertsatplay

Recent projects

From Antwerp to India, SBE is taking steps in progress and innovation all over the world. Below you will find a selection of our most recent projects.

Discover all projects

Our awards

Other news

Curious about what is happening within SBE? Or in which projects we are involved? Through these newsitems we will keep you informed about our projects and the ins and outs within SBE.

Discover our scoops
Seine-Schelde sluis Harelbeke engineering SBE #teamsbe #expertsatplay

Questions?

Do not hesitate to contact us, we are happy to help you!

Contact us