Conversion Durme valley, part of the Sigma plan

  • Location: EAST-FLANDERS [BE]
  • Discipline: PORT, RIVER & HYDRAULIC ENGINEERING
  • Period: 2010 - ...
Durmevallei Sigmaplan Ontpoldering Klein Broek SBE engineering #teamsbe #expertsatplay
Source: De Vlaamse Waterweg

With the Sigma Plan, the Flemish government is protecting the Zeeschelde basin in Flanders against storm influences from the North Sea and restoring rare river nature. In the Durme Valley, SBE is involved in the works at three locations:

  • De Bunt area in Hamme along the Durme and the Scheldt
  • The areas of Klein Broek and Groot Broek in Temse and Waasmunster along the Durme.

The implementation of the works in the three sub-areas is phased. Both the studies relating to the construction of the ring dykes and the studies of the overflow dykes, the depoldered dykes and the layout of the inner area will be carried out by SBE. The projects pose challenges in different areas, such as geotechnics, lock design and the design of the pump building. The varied, long-standing expertise offered by SBE means an integrated approach is guaranteed.

Subprojects

  • Durmevallei Sigmaplan Pompgebouw De Bunt

    Controlled flood area De Bunt

    The De Bunt project area in Hamme will be transformed into a controlled flood area with reduced tides (CFA-RTA). The controlled flood area (CFA) means that with a storm surge in the Scheldt, the area can be flooded using the new overflow dykes. The excess water from the Scheldt is buffered in the area and slowly drained back into the Scheldt after the storm.
    View this project
  • Durmevallei Sigmaplan Ontpoldering Groot Broek SBE engineering #teamsbe #expertsatplay

    Depoldering of Klein Broek and Groot Broek

    The Klein and Groot Broek areas will be depoldered so that the Durme will have flooding space and tidal nature can flourish here. Here, too, the work starts with the raising of a ring dyke and the necessary appurtenances. Two pumping stations will be built on the site of Groot Broek, which will make it possible to discharge surface water collected behind the new ring dykes into the Durme during a high tide.
    View this project

Recent projects

From Antwerp to India, SBE is taking steps in progress and innovation all over the world. Below you will find a selection of our most recent projects.

Discover all projects

Our awards

Other news

Curious about what is happening within SBE? Or in which projects we are involved? Through these newsitems we will keep you informed about our projects and the ins and outs within SBE.

Discover our scoops
Seine-Schelde sluis Harelbeke engineering SBE #teamsbe #expertsatplay

Questions?

Do not hesitate to contact us, we are happy to help you!

Contact us