The Klein and Groot Broek areas will be depoldered so that the Durme will have flooding space and tidal nature can flourish here. Here, too, the work starts with the raising of a ring dyke and the necessary appurtenances. Two pumping stations will be built on the site of Groot Broek, which will make it possible to discharge surface water collected behind the new ring dykes into the Durme during a high tide. A total of 15 structures (pumping stations, drainage sluices and culverts) will be built to ensure that the upstream discharge is managed in an orderly fashion in the new layout.
In respect of Groot Broek, the works will be phased as follows:
For Klein Broek, the phasing is divided up in the same way: