
Also in this project, the bridge in Viersel will be renewed in order to achieve a headway of 9.1 metres and the canal will be widened to 86 metres. SBE’s expertise was called upon by contractor Victor Buyck Steel Construction nv to bring this project to a successful conclusion. Various aspects needed to be addressed: demolishing the existing bridge, building the new abutment and a new steel bridge, adapting to the roadway so that it connects to the new bridge, and finally the construction of new bank defences.
The design of the arch bridge consists of thin arched legs that come together at the top in a central arch with limited height, resulting in a very slender geometry. From this arched construction, the concrete bridge deck is suspended with solid hangers made of high-grade steel. SBE took care of all implementation details, both the calculation and plans, in respect of temporary and permanent situations.

From Antwerp to India, SBE is taking steps in progress and innovation all over the world. Below you will find a selection of our most recent projects.
Curious about what is happening within SBE? Or in which projects we are involved? Through these newsitems we will keep you informed about our projects and the ins and outs within SBE.

