Bypass: a temporary highway for a lasting change

  • Location: Antwerpen [BE]
  • Discipline: BURGERLIJKE BOUWKUNDE & INFRASTRUCTUUR, URBANISME & ONTWERP
  • Period: 2017 - ...
  • Opening
    25/10/25
  • Start studie
    Okt 2020

The Oosterweel connection completes the Antwerp Ring and partially puts it underground. The project aims to finally untangle the mobility bottleneck around Antwerp and improve the livability in and around the city.
An important step in this process is the Bypass: a temporary highway that takes over traffic from the existing Ring, allowing the Merksem viaduct to be demolished and make way for the future sunken Ring.

Bypass

The Bypass is the largest accessibility measure in the implementation of the Oosterweel connection. From 25 October 2025, traffic heading to the Netherlands will use the first section of this temporary highway, a milestone in the works on the right bank.

The task: making room for the sunken Ring

To build the new sunken Ring, the current Ring had to be temporarily relocated. The Bypass forms this temporary Ring, constructed on the east side of the current route. The Bypass is 5.5 kilometers long, has three lanes per direction plus a hard shoulder, and a maximum speed of 70 km/h. For about eight years, it will guide traffic around the construction site: safely, efficiently, and without putting extra strain on the residential areas of Merksem and Deurne.

Bypass

An ingenious design: the arch bridge over the Albert Canal

A technical highlight of this project is the arch bridge over the Albert Canal. Since the temporary Ring needed to cross the canal, a single-span bridge of 150 meters was chosen, designed as a bowstring bridge.

What makes this bridge unique is the innovative truss arrangement of the bars instead of straight, flexible hangers.
– The bridge is straight, but the road follows a curve. Due to the camber of the roadway, a doubly curved deck was created, making the geometry especially challenging.
– This design provides more stiffness with less material, which is beneficial both economically and ecologically.

Bypass

The bridge deck is built as an orthotropic steel plate deck: a lightweight, stiff structure mostly prefabricated in the workshop. The bridge is then floated into its final position, limiting disruption on the construction site and significantly shortening the construction time. Since the bridge has a lifespan of only about ten years, it was designed for easy dismantling and recycling, keeping its ecological footprint minimal.

A joint effort

The Bypass is a feat completed just a year and a half after obtaining the permit, an exceptional achievement given the scale and complexity of the project.
This success is the result of close collaboration between the client Lantis, TM ROCO, TM Sturino, and numerous public and private partners.

Bypass

Towards a more livable Antwerp

The Bypass is temporary, but its impact is lasting. Once the sunken Ring is completed, the Bypass will disappear, making way for the Ringparks: green areas where nature, sports, and social interaction take center stage. In this way, the Bypass not only keeps Antwerp accessible during the works, but also paves the way for a smoother, safer, and healthier city.

Bypass

The role of SBE

  • SBE handled the complete study of this structure, from concept to detailed design.
  • The model was fully parameterized, allowing it to drive both the calculations and the drafting.
  • This approach allowed for rapid optimization and consistency throughout all project phases, from the initial concept sketches to on-site execution.
  • In addition, SBE is working, together with Royal HaskoningDHV and Tractebel, within the Temporary Partnership Sturino (North Ring Study).
  • Sturino supports the contractor consortium TM ROCO (Rechteroever Combinatie) in developing the detailed design for the works on the right bank.
  • This includes not only the final structures but also all temporary and preparatory constructions needed to carry out the project safely and efficiently.

This appeared in the media

Recent projects

From Antwerp to India, SBE is taking steps in progress and innovation all over the world. Below you will find a selection of our most recent projects.

Discover all projects

Our awards

Other news

Curious about what is happening within SBE? Or in which projects we are involved? Through these newsitems we will keep you informed about our projects and the ins and outs within SBE.

Discover our scoops
Seine-Schelde sluis Harelbeke engineering SBE #teamsbe #expertsatplay

Questions?

Do not hesitate to contact us, we are happy to help you!

Contact us