Vlas bridge

  • Location: WIELSBEKE, WAREGEM [BE]
  • Discipline: CIVIL ENGINEERING & INFRASTRUCTURE, URBANISM & DESIGN, HYDRAULIC ENGINEERING
  • Period: 2020 - 2023
  • Public Vote Winner: Bridge of the Year at the Archello Awards 2024
    December 2024
  • Selected for the Archello Awards 2024 Longlist in the Bridge of the Year category
    November 2024
  • Winner of the Architizer A+Awards - category Transportation Infrastructure
    June 2024
  • Nominated for the ArchDaily 2024 Building of the Year Awards
    February 2024
  • Selected by ArchDaily as 1 of the the five pedestrian bridges, changing how they view urban revitalization in today's cities.
    February 2024
  • Opening of the bicycle bridge
    April 2023
  • Start of works
    November 2021
  • Publication of opening quotations - awarding
    Spring 2021
  • Approval of the environmental permit
    March 2021
  • Implementation and tender file
    December 2020
  • Environmental permit application
    October-November 2020

The Lys River is being widened as part of the Seine-Schelde project to improve inland navigation in Flanders, without losing sight of nature and recreation. The client De Vlaamse Waterweg NV is working with the municipality of Wielsbeke and the City of Waregem to create a new bridge for cyclists and pedestrians. After completion, everyone will be able to enjoy the Lys and tourist attractions on both banks in a pleasant and safe manner. SBE is responsible for the integral design of the bridge, including approach ramps, environmental layout and the bank protection to be added.

An optimal tourist-recreational connection is formed across the Lys by opting for a connection between Wielsbeke on the left bank and Waregem on the right bank. Considering the landmarks in the vicinity, an S-shaped layout has been selected, which consists of a steel bridge and concrete access ramps.

The main consideration behind the bridge design, in addition to the usual technical requirements, is spatial integration within the green character of the landscape. The bridge should “disappear” into the landscape, where the view is not obstructed by protruding, visually dominating support elements. The design is not intrusive, but rather forms a harmonious whole through a sober structure with both promenades along the Lys on the banks. Existing vegetation will also be preserved to the maximum extent possible and restored where possible.

The various disciplines within SBE allow rapid and efficient switching between structural requirements and architectural design. The moment line created by its own weight is used to optimize the shape of the bridge. This typical moment line is inverted and used as a form for the supporting structure, which results in a dynamic and clean design, while also minimizing the use of material.

Seine Schelde Vlasbrug Waregem Wielsbeke SBE engineering #expertstplay #teamsbe

A parametric geometry model is built in the design phase due to the organic shape. Different variants can be tested by exporting this model into a calculation and drafting model. The most interesting design is ultimately selected by considering form, cost estimate, use of materials and technical requirements.

Given the redevelopment of the Seine-Scheldt connection, the CEMT class of the Lys should be widened to 58.45 m in the future. Installing bank protection, including exposed concrete cross-beams, at this stage already at the bridge and approach ramps means that only dredging work needs to be done at a later stage.

  • Vlasbrug Wielsbeke
    Vlasbrug Wielsbeke
  • Vlasbrug Wielsbeke
    Vlasbrug Wielsbeke
  • Vlasbrug Wielsbeke
    Vlasbrug Wielsbeke
  • Vlasbrug Wielsbeke
    Vlasbrug Wielsbeke
  • Vlasbrug Wielsbeke
    Vlasbrug Wielsbeke
  • Vlasbrug Wielsbeke
    Vlasbrug Wielsbeke
  • Vlasbrug Wielsbeke
    Vlasbrug Wielsbeke
  • Vlasbrug Wielsbeke
    Vlasbrug Wielsbeke
  • Vlasbrug Wielsbeke
    Vlasbrug Wielsbeke
  • Vlasbrug Wielsbeke
    Vlasbrug Wielsbeke
  • Vlasbrug Wielsbeke
    Vlasbrug Wielsbeke
  • Seine Schelde Vlasbrug Waregem Wielsbeke SBE engineering #expertstplay #teamsbe

Responsibilities SBE

SBE is responsible for the integral design of the new bridge and its surroundings.

  • Architecture
  • Design of cycle paths and surroundings
  • Stability design of the engineering structures (preliminary design to implementation design)
  • Preparation of the tender file
  • Preparation of environmental permit application

This was published in the media:

  • ArchDaily: read the full article here
  • Archello: read the full article here
  • Gooood: read the full article here
  • Parametric Architecture: read the article here
  • Selected by ArchDaily as 1 of the the five pedestrian bridges, changing how they view urban revitalization in today’s cities, read here

Masterplan

  • Seine-Schelde sluis Harelbeke engineering SBE #teamsbe #expertsatplay

    Refurbishment Seine Scheldt

    The Seine Scheldt project is a European initiative linking the Seine Basin (Paris region) with the Scheldt Basin (Antwerp). In Flanders, De Vlaamse Waterweg nv, supported by the European Union, is leading this pilot project. For our country, this means specifically adapting 7 waterways. On the one hand, sailing capacity will be increased, but on the other there is a need to carry out river restoration, recreation on and along the water, and urban renewal.
    View this project

Overige deelprojecten

  • Seine-Schelde sluis Harelbeke engineering SBE #teamsbe #expertsatplay

    Redevelopment of the Leie and lock complex at Harelbeke

    In order to make the Seine-Scheldt section navigable for ships up to 4,500 tonnes, the river Lys in Harelbeke needed to be made deeper. The future-proofing of the water site was accompanied by a new lock and barrage complex, the construction of 3 new bridges (2 fixed and 1 movable), bank defences, quay walls, soil protection and the redevelopment of the immediate surroundings.
    View this project
  • Seine Schelde Leie Doortocht Menen SBE engineering grote schepen binnenvaart waterbouw

    Menen crossing

    The works on the Lys crossing in Menen are on two fronts: on the one hand the straightening of the Lys itself in the city centre, which includes new quay walls and a new bridge, and on the other a new bicycle and pedestrian bridge in the outskirts of the project area.
    View this project
  • Seine-Schelde_Leie Pand 140 Sint-Baafs-Vijve Deinze De Vlaamse Waterweg Seinebekken SBE engineering #teamsbe #expertsatplay

    Calibration Lys Reach 140 (Sint-Baafs-Vijve to Deinze)

    This subproject involves the passage of the Lys between Sint-Baafs-Vijve and Deinze. In addition to the adjustment of the calibrated profile (especially from a nautical and hydraulic perspective), this project also focuses on the ecological and landscape aspects.
    View this project
  • Seine Schelde Pand 150 Harelbeke Sint-Baafs-Vijve SBE engineering #teamsbe #expertsatplay

    Calibration Lys Reach 150 (Harelbeke to Sint-Baafs-Vijve)

    This subproject involves the passage of the Leie River between Harelbeke and Sint-Baafs-Vijve. The Leie is deepened and widened (calibrated) to allow larger vessels to navigate on the waterway. In addition to the adjustments from a nautical and hydraulic perspective, this project also focuses on the ecological and landscape aspects by establishing nature-friendly riverbanks.
    View this project

Recent projects

From Antwerp to India, SBE is taking steps in progress and innovation all over the world. Below you will find a selection of our most recent projects.

Discover all projects

Our awards

Other news

Curious about what is happening within SBE? Or in which projects we are involved? Through these newsitems we will keep you informed about our projects and the ins and outs within SBE.

Discover our scoops
Seine-Schelde sluis Harelbeke engineering SBE #teamsbe #expertsatplay

Questions?

Do not hesitate to contact us, we are happy to help you!

Contact us